Hesitant Fuzzy Project Planning and Scheduling using Critical path Technique

Main Article Content

B. Pardha saradhi, et. al.

Abstract

Hesitant fuzzy set is extremely useful performance to express people's uncertainty. But there are delicate points in conventional hesitant fuzzy set, which articulated the membershipdegrees  of an element to a given set only by some crisp numbers .Hesitant fuzzy set to Triangular Fuzzy Hesitant Fuzzy Set (THFS), in which the membership degreeof an element to a given set is expressed by several possible triangular fuzzy numbers. A new plan to determine the critical path in the project network  using Triangular  Hesitant  Fuzzy set (THF).In this project network Each activity time is THFS.One of multicriteriadecision making Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is used  for the  project network to identify the best path in the  project.Finally a numerical exemplar is furnished to elucidate  the critical path of the project network.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Article Details

How to Cite
et. al., B. P. saradhi, . (2021). Hesitant Fuzzy Project Planning and Scheduling using Critical path Technique. Turkish Journal of Computer and Mathematics Education (TURCOMAT), 12(6), 5272–5286. https://doi.org/10.17762/turcomat.v12i6.9342
Section
Articles