Approximation methods to solve a single machine scheduling problem with fuzzy due date to minimize multi-objective functions

Main Article Content

Hanan Ali Chachan, et. al.

Abstract

In this paper present three methodant colony optimization (ACO), particle swarm optimization (PSO) and bees algorithm optimization (BAO) to the  solution multi-objective function  of single machine problem with the fuzzy due date. The objective function to minimize total completion time and maximum lateness with a fuzzy due date. By a computer simulation used to  compare the performance of each algorithm with another one from where accuracy and time.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Article Details

How to Cite
et. al., H. A. C. . (2021). Approximation methods to solve a single machine scheduling problem with fuzzy due date to minimize multi-objective functions. Turkish Journal of Computer and Mathematics Education (TURCOMAT), 12(11), 704–713. https://doi.org/10.17762/turcomat.v12i11.5953
Section
Research Articles