et. al., A. M. S. . (2021) “Standard Time Calculation Of Tempe Production Process Using Snapback Time Study Method (Case Study: Tn Group Home Industry)”, Turkish Journal of Computer and Mathematics Education (TURCOMAT), 12(8), pp. 617–621. Available at: https://turcomat.org/index.php/turkbilmat/article/view/2861 (Accessed: 21December2024).