et. al., B. P. saradhi, . (2021). Hesitant Fuzzy Project Planning and Scheduling using Critical path Technique. Turkish Journal of Computer and Mathematics Education (TURCOMAT), 12(6), 5272–5286. https://doi.org/10.17762/turcomat.v12i6.9342