UPPER BOUNDS FOR RUIN PROBABILITY IN A CONTROLLED GENERAL RISK PROCESS WITH RATE OF INTEREST IS A FIRST - ORDER. (2021). Turkish Journal of Computer and Mathematics Education (TURCOMAT), 12(14), 1070-1077. https://doi.org/10.17762/turcomat.v12i14.10391