[1]
Dubey, V. and Parihar, S. 2020. Examining the Indian Metro Rail Construction Industry’s EOT (Extension of Time) Claim Process and Including a Case Study. Turkish Journal of Computer and Mathematics Education (TURCOMAT). 11, 2 (Aug. 2020), 1302–1307. DOI:https://doi.org/10.61841/turcomat.v11i2.14595.